Skip to content

Bridgend College supports more than 7,500 students across three campuses in Bridgend, Pencoed, and Queens Road. Brookbanks have helped construct a £50 million new town centre campus providing 13,000m² of education space spread over two buildings.

Our Role

  • The construction of new buildings that will provide exceptional teaching and learning facilities, including a theatre, hair and beauty salons, recording and dance studios, design workshops, and more.
  • We provided a 750k saving on the original consultant provided tender structure at RIBA Stage 3
  • We were appointed for Civil & Structural designs from concept. Collaborating with planning and detailed design team

The Outcome

  • Creating a modern learning and teaching facilities, combined with community benefits including a 200-seat theatre space, a coffee shop and flexible meeting spaces.
  • The building consists of an 8-storey concrete framed flat slab structure with a steel framed clear spanning theatre.
  • Building built over an existing backfilled quarry. Specialist piling techniques and void spanning foundations were therefore required. 

Project Highlights

  • Architects Rio Architects
  • Value £50 Million
  • Our services Structural Design, Civils Layout and Drainage Design

Key Team Members

Group Director for Structural Engineering

Chris Vivian

Read Profile
Senior Structural Engineer

Jacob James

Read Profile

Related Case Studies