Full structural design and detailing of apartment blocks, townhouses, and commercial units.
-
Podium deck design supporting the development’s upper-level pedestrian realm above basement car parking.
-
Civil infrastructure design, including drainage, access, retaining structures, and integration with adjacent highway network (A4 Bath Road).
-
Coordination with M&E services for the Vital Energi ESCo system and associated plant space.
-
Foundation and substructure design addressing challenging brownfield conditions adjacent to the River Avon.
-
Design-stage support on phasing, fire strategies, and temporary stability during multi-typology construction.
-
Podium Deck Structure:
A reinforced concrete transfer podium deck was developed to provide a robust platform for public realm spaces and multi-storey buildings above, while accommodating car parking and services beneath.
-
Load management and deflection criteria were carefully modelled to support heavy landscaping, planters, and vehicular access.
-
Mixed-use Superstructure:
The site accommodates a mix of apartment blocks, townhouses, and commercial units, requiring flexible grid layouts and transfer structures.
Brookbanks optimised column positions and slab depths to reconcile architectural layouts with efficient structural zones.
-
Foundations and Ground Conditions:
The riverside, brownfield nature of the site required a comprehensive ground investigation and the use of piled foundations to manage settlement and contamination risk.
Brookbanks provided full design and inspection support throughout foundation works.
-
Drainage and Civil Infrastructure:
Surface and foul drainage systems were designed by Brookbanks to integrate with the site’s podium and public realm.
SuDS measures, including attenuation beneath landscaped areas, were adopted to manage runoff and improve water quality before discharge to the River Avon.