Skip to content

The construction of the British Library took 23 years. Its 112,000m2 space is arranged over 14 floors, with 5 below ground in the 25m-deep basements.

Our Role

We were appointed to undertake the mechanical, electrical, public health and lift services designs for the entirety of the project. Besides the library, the building also contains 11 reading rooms, a conference centre with a 255 seat auditorium, 6 self-contained meeting rooms, 2 restaurants and exhibition galleries.

The Outcome

Our designs included a robust energy management system that controls the air conditioning, VAV and constant volume systems throughout the building, as well as the central boiler and refrigeration plant installed in the basement. Sensitive fire detection and prevention infrastructure was specified throughout the venue in addition to sophisticated security measures and public address system.

Specialist lighting was designed throughout the development, with the sensitive exhibits being housed in environmentally controlled showcases lit by innovative fibre-optics.

A bespoke mechanical book handling system formed a significant proportion of our work, enabling the Library to easily move its collection of over 14 million books.

Project Highlights

  • CLIENT Coventry City Council
  • MECHANICAL ENGINEERING
  • ELECTRICAL ENGINEERING
  • PUBLIC HEALTH ENGINEERING
  • LIFT ENGINEERING
  • ENERGY & LOW CARBON DESIGNS

Sectors

Key Team Members

Mechanical Engineer

Keith Belding

Read Profile
Associate Director, Mechanical Engineering

Michael Hewitt

Read Profile
Group Director for M&E / Head of London Office

Paul Rushmer

Read Profile