10 Grosvenor Street, located in the heart of the Mayfair Conservation Area, comprises 23,746ft2 Grade A office space arranged over 3-storeys.

Our Role

We were appointed to undertake Stage 3 employer’s requirements for the CatB fit-out of our client’s 10,000ft2 ground floor offices. Our responsibilities also involved monitoring the installation works for the duration of this design-and-build contract.

The Outcome

The entire office floor is served by specialist LED lighting with motion-sensing lighting controls, and air conditioning via a 4-pipe fan-coil unit. Under-floor power distribution has been installed to wire-managed desks via floor grommets, and a card-activated access system has been installed in addition to the landlord’s building-wide security measures. Provisions for the comms room included for n+1 dedicated cooling.

The completed fit-out comprises cellularised executive offices, an open-plan office floor, and informal breakout spaces with tea-points and a small staff kitchen. The self-contained boardroom and meeting suite has been provided with sophisticated audio-visual facilities.

Project Highlights

  • CLIENT Moorfield Group
  • MECHANICAL ENGINEERING
  • ELECTRICAL ENGINEERING
  • PUBLIC HEALTH ENGINEERING
  • ENERGY & LOW CARBON DESIGNS
  • CAT B DESIGN

Sectors

Key Team Members

Director, Mechanical and Electrical Engineering Group

Lucy Wildesmith

Read Profile

Related Case Studies