
Anglian Water HQ
Situated in Huntingdon’s Ermine Business Park, this 33,000ft2, two-storey property was built in 1992. As new, incoming tenants, Anglian Water requested a full refurbishment before they relocated their organisation to this larger facility.
Our Role
Our responsibilities comprised a full services stripout, enabling works package and design of the new shell-and-core and Cat A/B services. These encompassed both the existing building and two new constructions; a new entrance area at the front of the building and new plantrooms to the rear. PV units and Mechanical Vent Heat Recovery were also installed to assist with the building’s efficiency.
The Outcome
The refurbishment created open plan and cellular office spaces for 450 employees, AV-equipped board and meeting suites, IT rooms and a staff café.
Project Highlights
- CLIENT Anglian Water
- MECHANICAL ENGINEERING
- ELECTRICAL ENGINEERING
- PUBLIC HEALTH ENGINEERING
- ENERGY & LOW CARBON DESIGNS
- LIFT ENGINEERING
- CAT A&B FIT OUT
Sectors
Brookbanks Groups
Key Team Members
Keith Belding
Read Profile
Paul Rushmer
Read ProfileRelated Case Studies


