Aylesbury Grammar School
Aylesbury Grammar School in Buckinghamshire planned a significant school-wide refurbishment and upgrade of its heating, hot water and cold water systems.
Our Role
Brookbanks was appointed by the school to carry out a feasibility study, produce a range of building services design options and provide a recommendation and proposed budget in support of a funding application.
Following a detailed site survey, our team developed and assessed a series of options to identify a practical, deliverable approach for the school estate.
The Outcome
The recommendation gave the school a clear route forward for improving core building services across the campus, supporting its funding application with robust technical advice and budget guidance.
The recommended solution comprised a complete refurbishment of the existing heating systems, with targeted modifications local to specific buildings. The cold water services were fully refurbished, while hot water services were converted to local electric hot water generation in many areas. A site-wide BMS was also installed.
Project Highlights
- Mechanical Engineering
- Electrical Engineering
- Energy & Low Carbon Designs
Sectors
Brookbanks Groups
Key Team Members
Mike Doyle
Read ProfileRelated Case Studies