Campbell Wharf, Milton Keynes
This is a multi-phase development of 383 residential units and commercial areas spread over 5 separate concrete framed buildings and 5 load bearing residential blocks. The green field site is located alongside the Grand Union Canal and the scheme includes a foot bridge and marina (designed by others).
Our Role
R&S have provided Civil and Structural consultancy services from inception to completion. The concrete frames are typically 6 stories high over a communal underground car park via a podium flat slab podium deck.
Blocks 3, 4 and 5 are linked below ground via a large basement car park which is surrounded to one side via contiguous piled walls next to the public highway.
All the buildings were produced in Revit and models were coordinated with the rest of the design team in order to eradicate clashes with Architectural and M&E items.