Aylesbury Grammar School in Aylesbury, Buckinghamshire is planning a significant school-wide refurbishment and upgrade of their heating and hot and cold water systems.

Our Role

We were appointed by the school to carry out a feasibility study, produce a range of services design options, and provide a recommendation and proposed budget in support of an application for funding. Following a site survey, a series of options was generated and a feasibility study was conducted.

The Outcome

Our design recommendation comprised of a complete refurbishment of the existing heating systems, with some modifications local to specific buildings. The cold water services would be completely refurbished, and the hot water services would be converted to local electric hot water generation in many areas. A site-wide BMS will be installed.

Project Highlights

  • Mechanical Engineering
  • Electrical Engineering
  • Public Health Engineering
  • Energy & Low Carbon Designs

Sectors

Brookbanks Groups

Key Team Members

Senior Mechanical Engineer

Mike Doyle

Read Profile
Director, Mechanical and Electrical Engineering Group

Robert Keane

Read Profile

Related Case Studies