Discovery Academy
A new academy on the site of the former Willfield Secondary School, the project required extensive reclamation works as a result of the former coal mining legacy beneath the site.
Our Role
With a capital cost of £20 million, Discovery Academy was one of 18 school buildings in Stoke-on-Trent City Council’s £270 million Building Schools for the Future programme. We completed civil, structural and highway design works for this flagship project, as well as:
- Civil engineering
 - Structural engineering
 - Contract administration
 - Principal Designer
 - Visiting Engineer
 
The Outcome
- The two-storey building includes flexible teaching spaces and indoor and outdoor sports facilities, including a multi-use games area and an astroturf pitch, which is available for use by local clubs and the wider community
 - Extensive music facilities were also provided including a performance hall, three drama/music studios, six music practice rooms, a recording studio, control room and music storerooms
 
Project Highlights
- Client: Stoke on Trent Council
 
Sectors
Brookbanks Groups
Key Team Members
    
        Development Director
        
              
  
Andy Tinnelly
Read Profile
    
        Senior Cost Consultant 
        
              
  
George Wood
Read Profile
    
        Production Director
        
              
  
Richard Darlow
Read Profile
    
        Group Technical Director
        
              
  
Richard Moorcroft
Read ProfileRelated Case Studies
                                
    
                            
           Commercial|                
           Industrial|                
           Mixed-use        
Ben Ainslie Racing Headquarters
View Ben Ainslie Racing Headquarters