Adur Civic Centre
The redevelopment of Adur Civic Centre in Shoreham-by-Sea is delivering 159 new homes and 10 commercial units for Hyde Housing. The scheme comprises a mix of social rent and shared ownership apartments arranged across two residential blocks, with commercial space located at ground floor level. The buildings range from 3 to 9 storeys in height and are positioned around a central landscaped courtyard, creating a sustainable and well-connected community within walking distance of the town centre.
Our Role
Brookbanks provided both Structural and Civil Engineering services for the development, supporting the project from detailed design through to Building Safety Act Gateway submissions.
Key responsibilities included:
- Delivering structural and civil engineering design services across the scheme.
- Leading the engineering design of Block B through Building Safety Act Gateway 2 and Gateway 3 submissions.
- Designing a reinforced concrete frame solution that provided structural efficiency, durability and long-term robustness.
- Collaborating closely with HGP Architects to optimise apartment layouts, reducing the need for structural transfers throughout the building.
- Developing foundation strategies that carefully coordinated with pre-existing piles on the brownfield site.
- Supporting a sustainable design approach through early multidisciplinary engagement and engineering-led optimisation.
The Outcome
Through early collaboration and coordinated design, the project achieved significant efficiencies in both construction and sustainability.
- Optimised apartment layouts reduced the number of structural transfers required, largely limiting them to the first floor where commercial units transition to residential accommodation above.
- The reinforced concrete frame delivered durability, robustness, excellent acoustic performance and the benefits of high thermal mass, supporting long-term building performance.
- Detailed coordination with existing foundations and piles on the brownfield site avoided clashes, reducing construction risk and delivering cost savings.
- Retaining and working around existing site constraints minimised disruption and reduced the environmental impact associated with extensive foundation removal or replacement.
- The engineering-led design approach helped support lower embodied carbon outcomes while maintaining buildability and programme certainty.
- The completed scheme will provide 159 high-quality affordable homes alongside commercial space, creating a vibrant mixed-use development for the Shoreham-by-Sea community.